This chart shows how Simple Mining continued to grow through both Bitcoin bull markets and bear markets, from its first repair store to a ten-site, 150 MW operating platform.

Active facilities

10

Across Iowa today.

Total capacity

150 MW

Current operating profile.

Machines managed

40K+

Across the fleet.

2025 Inc. 5000

#175

2,249% three-year growth.

Operating history

Growth through bull and bear markets

The Bitcoin price line shows market conditions; numbered markers show Simple Mining operating milestones.

Loading Bitcoin price history…
1

Feb. 2021

Opened the first miner repair store

Built an in-house repair capability before the first hosting site came online.

2

Q4 2021

Energized site No. 1

Launched Simple Mining's first owned and operated Bitcoin mining facility.

3

Q4 2022

Energized site No. 2

Added a second operating facility during the industry's 2022 market reset.

4

Q2 2024

Energized site No. 3

Expanded operations alongside a new headquarters and vertically integrated repair center.

5

Q1 2025

Reached 50 MW online

Crossed the 50-megawatt operating milestone with more than 2.5 EH/s online.

6

Aug. 2025

Named No. 175 on the Inc. 5000

Recognized with 2,249% three-year growth and ranked the fastest-growing company in Iowa.

7

Q4 2025

Launched a 50 MW hydro site

A major hydro-cooled expansion pushed total operating capacity beyond 100 MW.

8

Q1 2026

Added another 10 MW site

Continued the multi-site buildout with an additional operating facility.

9

Aug. 2026

10 sites and 150 MW

Simple Mining's current data-center-services profile lists ten active facilities and 150 MW of total capacity.

Bitcoin price source: Blockchain.com market-price history with a live quote appended when available. Quarter-only company milestones are plotted at the middle of the quarter for display; the marker is not an exact energization date.

Why the overlay matters

Growth continued through bull and bear markets

Site No. 2 was energized in Q4 2022, as the Terra/Luna collapse, FTX bankruptcy, and miner distress pushed Bitcoin and mining economics toward cycle lows.

The next buildout arrived around the 2024 halving, when the block subsidy fell from 6.25 BTC to 3.125 BTC. Capacity then expanded from 50 MW in early 2025 to more than 100 MW after a 50 MW hydro launch later that year.

The chart is not claiming that price caused each expansion. It shows that the company kept executing across radically different capital and mining environments.

Evidence and conventions

Dated milestones, transparent placement

Bitcoin prices come from Blockchain.com. The Inc. 5000 rank and growth rate come from Simple Mining's Inc. company profile. Current scale comes from the data center services page.

Quarter-only milestones are plotted at the middle of their quarter. That keeps the visual honest: the marker represents a period, not a fabricated exact energization date.

Company-provided milestones are labeled as such in the source record. Recognition and live-market data link to external sources.

Milestone ledger

The record behind the markers

PeriodMilestoneWhat changedSource
Feb. 2021Opened the first miner repair storeBuilt an in-house repair capability before the first hosting site came online.Company milestone
Q4 2021Energized site No. 1Launched Simple Mining's first owned and operated Bitcoin mining facility.Simple Mining roadmap
Q4 2022Energized site No. 2Added a second operating facility during the industry's 2022 market reset.Simple Mining roadmap
Q2 2024Energized site No. 3Expanded operations alongside a new headquarters and vertically integrated repair center.Simple Mining roadmap
Q1 2025Reached 50 MW onlineCrossed the 50-megawatt operating milestone with more than 2.5 EH/s online.Simple Mining roadmap
Aug. 2025Named No. 175 on the Inc. 5000Recognized with 2,249% three-year growth and ranked the fastest-growing company in Iowa.Inc. 5000 company profile
Q4 2025Launched a 50 MW hydro siteA major hydro-cooled expansion pushed total operating capacity beyond 100 MW.Company milestone
Q1 2026Added another 10 MW siteContinued the multi-site buildout with an additional operating facility.Company milestone
Aug. 202610 sites and 150 MWSimple Mining's current data-center-services profile lists ten active facilities and 150 MW of total capacity.Simple Mining data center services